2023 It is a term paper The topic is Rockwell Automation Factory Talk SCADA The | Assignment Collections
Computer Science 2023 Term Paper On ‘Rockwell Automation – Factory Talk (SCADA)’
2023 It is a term paper The topic is Rockwell Automation Factory Talk SCADA The | Assignment Collections
It is a term paper.The topic is ‘Rockwell Automation – Factory Talk (SCADA)’ The paper shall be at least five (5) and no more than ten (10) pages in length excluding figures, tables, and references. The paper shall be formatted using an 11-point font of either Arial, Helvetica, or Times Roman type using 1″ margins on the sides and double-spacing between lines with 0.5″ indentation on first line of paragraphs. The paper shall be written using the APA style guide seventh edition published in October 2019. Online guidance can be viewed at https://apastyle.apa.org.All tables and figures shall be captioned and specifically referenced in the body of the document. All references shall be stated and included as endnotes in this paper. Citations must meet the following requirements:
- No more than two (2) citations shall be from Wikipedia
- At least two (2) references shall be from United States government sites (e.g. CISA, NIST)
- At least two (2) references from vendor web (html) or printed (pdf) material
- At least two (2) references shall be from independent sources including but not limited to
- News Media Outlets (e.g. Reuters, Washington Post, Wired, CSOOnline)
- Industry Publications (e.g. Automation, ISSSource, Control)
- Trade Sources (e.g. Oil and Gas Journal, ChemWeek, PharmaTimes)
- Security Solution Providers (e.g. McAfee, Trend Micro, Dragos, Claroty) to name several.
The section titles (paper) and slide titles (presentation) in the templates are for reference only.Your paper and presentation shall address and develop each of the following items:
- System overview (textual) and architecture (graphical) covering devices and network topology explaining the function of each of the key assets
- Communication protocols used by the system
- Industry sectors that use the system
- Vulnerabilities publicly disclosed for the system and the publication of any exploitation packages
- Potential or actual impact of the vulnerabilities discovered to the industry sectors served
- Cyber security measures taken by the vendor to secure the system
- Additional cyber security measures that could be taken by the end-user user if the vendor recommendations are not feasible (e.g. an upgrade could not be performed in a timely manner)
Must have the following categories
INTRODUCTION
System Overview and Architecture
Market Analysis and Typical Use Case(s)
Major Vulnerability Disclosures
Impact Analysis
Risk Reduction Recommendations
Conclusion
We give our students 100% satisfaction with their assignments, which is one of the most important reasons students prefer us to other helpers. Our professional group and planners have more than ten years of rich experience. The only reason is that we have successfully helped more than 100000 students with their assignments on our inception days. Our expert group has more than 2200 professionals in different topics, and that is not all; we get more than 300 jobs every day more than 90% of the assignment get the conversion for payment.